Marsh Junior High School
Location: Marsh Junior
Project Leader: Larios, Philip (email)
Volunteers Needed: 30
Volunteers YTD: 2
Project Description
Add four more planter boxes by the Green house
Add and fix existing drip systems in and outside of the green hous
Plant ground cover in planting beds around the campus
weed and trim landscape all around front buildings of school
Spread bark out in open area
Thanks,
Jay Marchant
Principal
Marsh Junior High
(530)895-4110
Project Leader Notes
Jay Marchant onboard
Phil Larios will Project Lead here or elsewhere
Get Involved!
Want to help with this project?
Register for an Account to Volunteer or Sign In
Donate Resources
Project Needs
| Need | Qty/Units | |
|---|---|---|
|
Materials -
Fencing Roll Cross Wire |
1 / 50'x36"x12" | |
|
Materials -
Fencing Roll Cross Wire |
2 / lbs. 16d HD galv. nails | |
|
Materials -
Lumber 4 x 4 x 8 Pressure Treated Posts |
2 / | |
|
Materials -
Lumber Other (size, length, number) |
8 / 2x12-12' Pressure treated | |
|
Materials -
Lumber Other (size, length, number) |
4 / 2x12-6' pressure treated | |
|
Materials -
Plumbing Drip System Pipe |
1 / roll x 100' | |
|
Materials -
Plumbing PVC Sch40 Pipe |
2 / 1/2 x 20' | |
Project Tasks
| Task | Kid Friendly | Actions |
|---|---|---|
| Add and fix existing drip systems in and outside of the green house | Yes | |
| Add four more planter boxes by the Green house | Yes | |
| Build three new benches in the front of the school | No | |
| Consult and advise on landscape of front areas of school | No | |
| Plant ground cover in planting beds around the campus | No | |
| Possible walk-way across bark area | No | |
| Re-do bulletin boards in Main office | No | |
| Spread bark out in all planting beds | Yes | |
| Stencil and Paint “2009 California Distinguish School” Logo on rafter in front of the office | No | |
